IPP-2 Salalah

A second power facility in Dhofar region should come on-line. Referred to as the Salalah Independent Power Project (IPP) 2, the new IPP should produce 280 MW of power, and work is expected to move quickly on the project in order to take advantage of the rapid infrastructure, industrial and tourism development in the area. the project should be finished at the end of 2016.

MNT Involvement:

Civil works

  • Site leveling
  • Temporary building works
  • Construction of buildings from excavation to the finishing
  • ROAD work asphalt, road drainage system, road side walkways work and road LIGHTs
  • BACK FILLING and leveling
  • EXCAVATION

Mechanical works

  • Fabrication
  • Erection

Electrical works